Hybrid Battery Trains for Amtrak

Standard

Siemens Mobility have just been awarded a $3.4 billion contract for 73 of the new Venture 4-car trains for the Northeast Corridor, with the first deliveries due in 2024, and included in that order are 15 diesel-battery hybrids, 50 are electro-diesels, with the remainder EPA4 compliant diesels. But this contract also includes technical support along with design and construction.

Sometimes from our position in Europe we simply see the USA as the home of the automobile, and gas guzzling muscle cars, and so depndent on road transport. But, it is true to say that these days, sustainability in rail transport is driving the modernisation programmes there, and this latest project clearly indicates the commitment to carbon emissions reduction for the long term. This is Siemens largest ever North American contract, includes maintenance and monitoring services, together with the potential for another 140 of these trains, and additional maintenance contracts.

What are they? Well, Amtrak is following a brief to operate the most sustainable and efficient trains on the market, which include dual powered and hybrid battery vehicles. Amtrak has without doubt transformed passenger rail travel in the USA over its 50 year history, and has had its share of ups and downs along the way, but these trains will include ‘American made equipment’.

The video below shows the Amtrak Siemens Venture test train at Hammon, Indiana 0n the 25th January 2021, where the difference when compared to a Heritage Fleet car in the consist can be clearly seen.

They are based on the well known Siemens Viaggio series of passenger coaches, operated in Austria, Switzerland, Czech Republic, Israel, Russia, and Florida. In the USA they were purchased by the first privately owned and operated main line railway since Amtrak was formed in the 1970s – AAF (“All Aboard Florida”). This subsequently became Virgin Trains USA, and most recently as Brightline Trains.

The new trains will operate along the Northeast Corridor and across various state-supported routes, including operations in Maine, Massachusetts, New York, North Carolina, Oregon, Vermont, Virginia, and Washington. With expanded capacity and the ability to shorten trip time, Amtrak expects the new trains will add over 1.5 million riders annually.

Amtrak’s CEO Bill Flynn was full of praise for the new trains, and commented:

“These new trains will reshape the future of rail travel by replacing our aging 40-to- 50-year old fleet with state-of-the-art, American-made equipment.”

“This investment is essential to preserving Northeast Regional and state- supported services for the future and will allow our customers to travel comfortably and safely, while reducing carbon emissions.”

It is expected that the first of the new trains will enter service in 2024, followed in 2025 by testing of the first Venture Hybrid battery train, and overall, the current contract should see trains delivered to the NEC and the other state supported routes on track between 2024 and 2030. The trains will be manufactured at Siemens Mobility’s manufacturing facility in Sacramento, California and will comply with the Federal Railroad Administration Buy America Standards.

Of course, it’s also Amtrak’s 50th Birthday this year – Happy Birthday Amtrak!

Amtrak Downeaster – Rollingsford, NH – Amtrak 681 AMTK 46 90220

Further reading:

Or, maybe read the story of the first decade or two here:

-oOo-

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.